Hybrid planning is mostly measurement. These sections take you from a suspicion that wind could help, to either a hybrid configuration or an honest solar-only design.

1. Document the shortfall

Start with the problem in writing: which months fall short, by how the site experiences it, such as lights dimming, batteries emptying by morning, or a generator running to fill the gap. If a solar system already exists, its worst month is your primary document. If nothing exists yet, describe the load and the season you fear most. A hybrid system added without a documented shortfall is usually money spent in the wrong place.

2. Assess the wind where the turbine would stand

Wind at rooftop height behind buildings is not the wind a turbine needs. Use the site assessment checklist: openness, obstacles, the direction weather arrives from, and what local knowledge says about the windy season. The key question is timing: does the wind rise in the same months the sun falls? Wind that only blows in summer, when solar is already strong, adds little.

3. Profile the load

List the loads and their hours. Night-heavy loads benefit most from a source that can generate after dark; day-heavy loads may be served better by more array. Note which loads are critical and which can rest during calm, cloudy spells, because that ranking decides battery size in both hybrid and solar-only designs.

4. Decide, then inquire

Compare the two designs on your own numbers with the hybrid versus solar-only comparison. If the assessment supports wind, the family page describes the wind and solar hybrid system; if it does not, a solar-only configuration with a larger array and battery is the honest outcome of the same planning work, and the basics article explains why.

Before ordering, confirm minimum order quantity and lead time for your configuration.

Keep an assessment diary

Where time allows, keep a simple diary for the site across the weeks before the decision: note the days when flags, trees or dust showed real wind, the hours it arrived, and how it matched the cloud. A diary does not replace instruments, but it converts impressions into a record, and it frequently settles the argument that matters, which is whether the wind comes with the bad weather or only with the good. Photographs of the proposed turbine position in different months, and notes from neighbours who have lived with the site for years, belong in the same file.

Bring the diary, the shortfall document and the load profile together when you inquire. A configuration discussion that starts from a season of observations produces a system whose reliability nobody has to hope for, because its two incomes were both seen working, in the months they were needed, before any money was committed.

Agree the decision rule in advance

Before the assessment begins, write down the rule by which you will decide: for example, that hybrid proceeds only if the observed wind covers the documented shortfall in the worst month, on the assessment's own notes. A rule agreed in advance protects the decision from enthusiasm in both directions, from the buyer who has fallen for the turbine and from the adviser who distrusts moving parts on principle. It also gives the project a clean record: if the rule is met, the configuration proceeds without a second debate; if it is not met, the solar-only branch proceeds with equal legitimacy, and nobody has lost an argument, because the weather made the decision.